Design that carries the project from resource to construction drawings
Mine, plant and tailings designed in one institute, in the sequence a financier expects to see, with three dimensional BIM coordination and clash detection before anything is fabricated.
Stages and deliverables
| Stage | Core work | Deliverable |
|---|---|---|
| Scoping and PEA | Preliminary economic assessment, option screening | Concept design report |
| Prefeasibility, PFS | Method selection, infrastructure, financial evaluation | Feasibility study report |
| Feasibility, BFS or DFS | Orebody modelling, reserve estimation, full study | Bankable feasibility report |
| FEED | Process flow diagrams, general arrangement, CAPEX estimate | Basic engineering design report |
| Detailed design, DED | Structural drawings, construction drawings, material take-off | Issued-for-construction package |
Four things the design institute is built around
- Compliance with GB codes, Eurocodes, US and Australian standards
- Deliverables prepared for JORC, NI 43-101 and VALMIN reporting
- Modular engineering for fast erection on remote sites
- Design integrated with procurement, construction and operation

Digital delivery
Design work is coordinated in three dimensional BIM with automatic clash detection, and handed over with VR and AR based digital project delivery including virtual commissioning of the digital twin. The practical value is narrow but real: interferences between piping, structure and equipment are found before steel is cut, and the operating team can walk the plant before it exists.
Design decisions lock most of the life-of-mine cost. Xinhai puts that figure at more than 70% of life-of-mine cost committed during design, which is the argument for spending longer on the flowsheet than on the tender.
Related services
Test work first
Design inputs come from the metallurgical test report, not from a comparable plant.
Test workModular engineering
Where site access or schedule is the constraint, the plant is designed as shippable modules.
Modular plantsBuild it with us
The same institute supports procurement, construction and commissioning under an EPC contract.
EPC deliveryCommon questions
Which design stages does Xinhai cover?
Are the deliverables usable for financing?
How large a plant can be designed?
What does the design institute consist of?
Send us the ore, the tonnage target and the site conditions. We reply with a scoped proposal.