Pilot plant circuit used for process test work

Insights

Notes from the laboratory, the design institute and the sites we operate. Articles are published as they are reviewed by the engineers who did the work.

Publishing schedule

This section is being built out. The first articles cover the questions that come up most often in project enquiries: how much test work a bankable study really needs, when dense medium separation beats flotation on lithium ores, what drives the gap between design recovery and actual recovery in the first operating year, and how the cooperation model changes the incentives in a contract operation.

If you need an answer before an article exists, ask our engineers directly. Enquiries about test work and flowsheet selection are answered by the people who run the laboratory.

Send us the ore, the tonnage target and the site conditions. We reply with a scoped proposal.

Every Xinhai proposal starts from test work, not from a catalogue. Tell us where the project stands and our engineers will come back with the delivery model, the scope split and the next step.

Request a project proposal