Where to start, by question
Most enquiries arrive as one of six questions. This page routes each one to the page that actually answers it, and says what you will need to have ready before the answer is any use.
Six questions, and where each one is answered
We don't publish articles on a schedule, and a page of placeholders helps nobody. What follows is the routing we'd give you on a call.
1. Is my ore going to behave?
Nothing downstream is decidable until this one is settled. Grade alone won't tell you; how the value mineral occurs will. Start at test work and research. Have ready: a representative sample, the element and phase analysis if it exists, and an honest statement of how the sample was taken. A composite from a single trench answers a different question than a spread across the orebody.
2. Which flowsheet applies to my mineral?
Go to the ore-type solutions and read the one that matches. Each sets out the route, where it fails, and the equipment the route implies. Read the route as a starting hypothesis — the test result is what confirms or kills it.
3. What should the contract cover?
This is where projects are won or lost, and it's a commercial question more than a technical one. EPC turnkey puts design, supply and construction under one signature. Contract mining and operation keeps us on site afterwards. Buying equipment alone is a legitimate option too — see equipment manufacturing. The boundary you choose decides which risks stay with you.
4. How long will it take, and what drives that?
Schedule is set by the long-lead items and by how much of the work can be moved off site. Modular plants shift assembly into a shop, which matters most where site access, labour or weather is the constraint. Ask about it early — it changes the construction scope, not just the delivery date.
5. Has this been done before, and by whom?
The project record lists what we've delivered by region and scope. Figures there are the ones reported in our own project brochures — read them as scope evidence, not as a forecast for your orebody.
6. Can you actually build it where my project is?
Two separate things get conflated here: engineering capability and statutory permission. Capability is on technical strength. Certifications and construction credentials are on qualifications — and note that the Chinese construction and design credentials listed there are Chinese credentials. They say what we're licensed to do in China. They don't grant statutory design or construction approval in your jurisdiction, and any proposal that implies otherwise is worth questioning.
What to send before the first call
The gap between a useful reply and a brochure is usually four or five facts.
- The mineral and how it occurs. Element and phase analysis if you have it. If you don't, say so — that's the first thing test work resolves.
- Target throughput. A number, even a rough one. Circuit sizing and equipment selection both hang off it.
- Where the project stands. Exploration, scoping, feasibility, permitted, or already built and underperforming. These lead to completely different conversations.
- Site constraints. Power, water, altitude, climate, road access, distance to port. These change the flowsheet, not just the logistics.
- The scope you're considering. Equipment only, design only, full EPC, or EPC plus operation.
Short and specific beats long and vague. Send it to the project team and you'll get a scoped reply rather than a catalogue.
Send us the ore, the tonnage target and the site conditions. We reply with a scoped proposal.
Technical articles
Longer write-ups on the questions that come up most often.
- Choosing an EPC Contractor for a MineA practical due-diligence checklist for selecting an EPC contractor. Questions to ask about design, fabrication, testwork, references, and contract structure.
- CIP vs CIL: Choosing the Right Project CircuitCIP vs CIL: how leach kinetics, preg-robbing and carbon inventory drive the circuit choice. Field notes for owners and EPC+M+O teams.
- Leaching Process of Copper: Heap, Vat, Agitation, In-SituCompare dump, heap, vat, agitation and in-situ copper leaching. Learn which ore and grade each suits, why acid consumption matters, and what testwork
- What Are the Ores of Copper? Sulphide and Oxide MineralsWhat are the ores of copper? Meet the sulphide and oxide minerals, what they look like in hand specimen, and how the oxide to sulphide ratio sets the route.
- Copper Processing Plant Cost: What Moves the BudgetLearn what drives a copper processing plant cost: ore hardness, grind size, flotation stages, regrind, dewatering, tailings, power, water and remoteness.
- Flash Flotation in the Grinding CircuitFlash flotation recovers liberated gold and sulphides early in the grinding circuit. Learn when it helps and how testwork decides if it fits.
- Fly Ash Processing: Classification, Beneficiation and UseFly ash processing turns coal combustion residuals into cement replacement. Learn classification, beneficiation routes, drying, grinding and EPA CCR rules.
- Gold Leaching: Daily Control for Contract OperatorsGold leaching is a daily control problem: feed density, pH, cyanide, oxygen and carbon. See how an EPC+M+O operator keeps a leach circuit stable and safe.
- How Is Copper Extracted from Ore? Mine to ConcentrateHow is copper extracted from ore? A field guide for mine owners: mining, crushing, grinding, flotation, leaching, SX-EW, smelting and refining.
- Mine Planning: From Resource Model to ScheduleHow a resource model becomes a pit or stope design and then a production schedule, with cut-off grade, blending, and plant constraints explained.
- Mineral Processing Plant Cost: A Budgeting FrameworkSee how a mineral processing plant cost estimate is built from testwork, flowsheet, equipment, civils and contingency, and where EPC+M+O shifts the risk.
- Inside a Mineral Testing LaboratoryWhat to expect from a mineral testing laboratory: sample prep, ore testing, grindability, and pilot-scale testwork—plus what ISO/IEC 17025 covers.
- Modular Mineral Processing Plant: Where They FitLearn where modular mineral processing plants fit, what site conditions favour containerised modules, and when stick-built plants remain the better choice.
- Oxidized Gold Ore: Why It Leaches DifferentlyWhy oxidized gold ore usually leaches well, what can still stop a project, and the tests that choose between heap leach and CIL. Field notes for mine owners.
- Silica Sand Washing Plant Cost: Scope and DriversSilica sand washing plant cost depends on feed, grade, water, and delivery model. See what drives the scope and how to compare quotes like an engineer.
- SX-EW Copper: When Leaching Beats FlotationLearn when SX-EW copper leaching beats flotation for a 1% Cu oxide or mixed deposit. Testwork, acid consumption, and route selection in one practical guide.
- Types of Gold Ore and How Each Is ProcessedTypes of gold ore drive every processing decision. This field guide maps free-milling, oxide, sulphide, carbonaceous and alluvial gold to the right route.
- What EPCM Means and When It Beats EPCEPCM explained: engineering, procurement and construction management shifts risk and cost control. Compare EPCM vs EPC for mining projects and see when EPC+M+O fits.