Analytical laboratory bench at the Xinhai mine research institute

Test work decides the plant, so it comes first

Every Xinhai flowsheet starts in the laboratory. Analysis, bench tests, pilot runs and site commissioning are handled by one team, which is why the plant behaves like the test report said it would.

0Element analyses per month
0+Test programmes per year
0+Ore types studied
0 m2Pilot centre area, research brochure figure

Four stages, one report chain

01

Analysis

Sampling, sample preparation, detection and analysis, data consolidation and reporting. Element, spectral and phase analysis identify what the orebody actually contains and in what mineral form.

02

Bench test work

Exploratory tests, verification tests and flowsheet tests. Sample preparation, scheme design, separation testing, product evaluation, flowsheet selection, report.

03

Pilot trials

Semi-continuous industrial trials in the pilot centre confirm the bench result at scale, including gravity, washing, flotation, chemical, magnetic and electrostatic circuits.

04

Commissioning

Commissioning engineers work with installation, electrical and automation teams on site until the plant reaches design output and grade.

Test methods and the parameters that matter

TestSuited toKey parameters
FlotationBase metals, rare metals, ferrous metals, industrial mineralsGrind size, pulp density, pH, reagent regime
Magnetic separationMagnetite, hematite, manganese ore, quartz purificationField intensity, feed size, throughput
Gravity separationGold, tungsten, tin, zircon and titaniumFeed rate, size range, medium density
Roasting and magnetic separationRefractory iron oresRoasting atmosphere, temperature, time
Electrostatic separationZircon, rutile, ilmeniteFeed size, throughput

Inside the laboratory and pilot centre

Prepared ore samples stored on laboratory shelves
Sample preparation and storage
Shaking tables running a gravity separation test
Gravity test rig
Pilot scale leaching and adsorption columns
Pilot leaching circuit
Pilot plant flowsheet equipment
Semi-continuous pilot line
Laboratory flotation and grinding equipment
Bench flotation and grinding
Gold bars produced from a Xinhai test programme
Doré from a test campaign

Reference test programmes

The results below are the ones reported in the Xinhai research and test service brochure. They describe those specific ore samples and cannot be extrapolated to another deposit.

Kazakhstan, 1.5 Mt/a copper flotation

Closed circuit conditions at a grind of 50% passing 200 mesh, one rougher, two scavenger and three cleaner stages. Copper concentrate at 3.50% yield, 16.23% Cu grade and 66.23% recovery.

Pakistan, phosphate extended continuous test

Direct flotation with two rougher and two scavenger and two cleaner stages, acid conditioning, then three stage reverse flotation. Phosphate concentrate at 62.10% yield, 22.43% P2O5 and 56.10% recovery.

Canada, integrated recovery from tailings

Lithium, rubidium and caesium recovered from tailings assaying 0.46% Cs2O, 1.2% Li2O and 0.5% Rb2O. The recommended route was spodumene flotation, then mica flotation, then pollucite flotation, producing a lithium concentrate at 3.83% Li2O and 57.92% recovery alongside mica, caesium, feldspar and quartz products.

Zimbabwe, 2 Mt/a spodumene dense medium separation

Petalite did not respond to flotation, so dense medium separation was tested with tetrabromoethane heavy liquid in the laboratory and ferrosilicon medium at pilot scale. The recommended flowsheet was crushing and screening, DMS to recover petalite, grinding and classification, gravity recovery of tantalum and niobium, desliming, mica flotation and spodumene flotation.

Common questions

What can the Xinhai laboratory analyse?
The laboratory runs element, spectral and phase analysis with ICP-MS, atomic absorption spectrometers, portable infrared spectrometers and visible spectrophotometers, at a reported throughput of around 5,000 element analyses per month.
How far can testing go before construction?
From exploratory and condition tests through open and closed circuit tests, to semi-continuous industrial trials in the pilot centre. The pilot centre is a provincial pilot demonstration base and a municipal key laboratory.
Which separation methods are covered?
Gravity, magnetic and flotation separation, cyanide leaching and adsorption, biological oxidation, acid leaching and hydrometallurgy, special separation, heap leaching, and tailings thickening and dry stacking.
Who uses the test results afterwards?
The same group. Test engineers, design engineers and commissioning engineers sit in one organisation, so the test report feeds the flowsheet and the equipment selection directly.

Send an ore sample brief and we will scope the test programme.

Tell us the deposit, the target product and the tonnage you are studying. We reply with a test scope, a duration and the deliverables you would receive.

Request a project proposal